
Architects: Arch-group + ABTB
Location: Moscow, Russia
Project team: Krymov M. D., Gorjainov A.V., Bashkaev T.I
Client: Moscow United electricity network company
Total area: 1,500 sqm
Design year: 2008
Construction year: 2008-2009
Photographs: Arch-group




This is project of the reconstruction of the network control centre of electricity- distribution company MOESK. The main space is the control room. There in a space of 320 m2 the we placed a two-level podium made of corian with workstations for six controllers and a wall of video screens. The wall consists of 36 Barco video cubes showing info on the condition of the electricity network.

Other space is decorated laconically. Such decision and dark floor have underlined the dynamical form of a snow-white podium. The wall finish Is perforated BILDEX. The luminescent lamps hidden behind the translucent ceiling – light up the space. Powerful projectors are turned to the workstations.
Không có nhận xét nào:
Đăng nhận xét